Road closures · Redwood

Redwood National Park road closures.

By Nicholas Major · Last updated

Redwood National Park road closures come mostly from two dated rules, not a winter season: the park lists its main roads as open and says any road it doesn't list is open. Each vehicle driving to Fern Canyon on Davison Road needs a reservation from May 15 to September 15, and the Newton B. Drury Scenic Parkway closes to cars on the first Saturday of each month from October to May. This is the schedule, not live status. For today, check the NPS current conditions page.

Redwood roads by 2026 opening date Howland Hill Road: open. Newton B. Drury Parkway: open. Parkway Bike and Hike Day: Closed to cars the first Saturday of each month, October to May. Bald Hills Road: open. Davison Road: open. Fern Canyon vehicle reservation: May 15, 2026 to September 15, 2026 Howland Hill Road: open Newton B. Drury Scenic Parkway: open Bald Hills Road: Highway 101 to Lyons Ranch Trailhead: open Davison Road: Highway 101 to Gold Bluffs Beach and Fern Canyon: open Hiouchi Visitor Center Crescent City Klamath Fern Canyon Prairie Creek Visitor Center Orick Lyons Ranch Trailhead Open, no seasonal closure listed Park boundary: NPS · state outlines: U.S. Census · roads: © OpenStreetMap contributors via OSRM · points as credited below
Every drawn road is teal because the park lists it open, with no closing season: Howland Hill Road east of Crescent City, the Newton B. Drury Scenic Parkway through Prairie Creek, Davison Road to Fern Canyon, and Bald Hills Road from Highway 101 to the Lyons Ranch Trailhead. The Fern Canyon reservation season and the parkway's Bike and Hike Days change access on set dates, so they're in the list, not on the map. This is a season map, not live status. Road lines are OpenStreetMap geometry routed by OSRM (© OpenStreetMap contributors, ODbL); status is from the NPS current conditions page.

In short

Redwood's main roads don't close for a season. The park's conditions table lists Bald Hills Road, Davison Road, the Newton B. Drury Scenic Parkway, Cal-Barrel Road, and Howland Hill Road as open, and says any road it doesn't list is open. Two rules change access on set dates. From May 15 to September 15, each vehicle driving to Fern Canyon and Gold Bluffs Beach on Davison Road needs an online reservation. From October to May, the 10-mile parkway closes to cars on the first Saturday of each month for Bike and Hike Day, next on October 3, 2026. In winter the parkway is often closed for days by fallen redwoods or ice, and NPS's scenic drives page says the short Cal-Barrel Road closes to vehicles. Trailers aren't allowed on Davison Road. An NPS alert warns of construction stops on Highway 101 between Orick and Crescent City. This is the schedule, not live status, so check the NPS conditions page before you go.

Use this pageShare or cite this guide

National Sites Guide

Share this page

Cite this page

Copy a citation

Every Redwood road and its rules.

Redwood National and State Parks follow Highway 101 for about 50 miles between Crescent City and Orick, and there are no entrance stations along the way. The current conditions page lists roads and day use areas from south to north, and says any road or day use area it doesn't list is open. On its table updated September 10, 2026, every listed road was open. Bald Hills Road had hazard conditions from road damage, and Mill Creek Day Use Area had a partial closure on weekdays, open for day use on weekends with the gate locked each evening. The park says conditions can change quickly because of weather, road maintenance, wildfires, and other factors.

Redwood road seasons, 2026 Howland Hill Road: open all year; Newton B. Drury Parkway: open all year; Parkway Bike and Hike Day: Closed to cars the first Saturday of each month, October to May; Bald Hills Road: open all year; Davison Road: open all year; Fern Canyon vehicle reservation: 2026-05-15 to 2026-09-15 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Howland Hill Road10 miles, mostly unpaved. Spring repairs can close parts. Newton B. Drury Parkway10 paved miles. Any size vehicle. Winter tree closures. Parkway Bike and Hike DayNext: Oct 3, Nov 7 and Dec 5, 2026.CLOSED TO CARS THE FIRST SATURDAY OF EACH MONTH, OCTOBER TO MAY Bald Hills RoadRoad damage. RVs and trailers not recommended. Davison Road8 miles of gravel, two stream crossings. Fern Canyon vehicle reservationDavison Road to Gold Bluffs Beach and Fern Canyon.May 15Sep 15
Redwood's main roads have no closing season, so most bars are teal: the park's conditions table lists them open and says any road it doesn't list is open. The rust bar is not a closure. It's the May 15 to September 15, 2026 window when each vehicle driving to Fern Canyon and Gold Bluffs Beach needs a reservation. Bike and Hike Days fall on single Saturdays from October to May, so that row shows words, not a bar.
Road segment2026 opening2026 closing
Howland Hill Road10 miles, mostly unpaved. Spring repairs can close parts.Open (listed Year Round)Open (listed Year Round)
Newton B. Drury Scenic Parkway10 paved miles. Any size vehicle. Winter tree closures.OpenOpen
Newton B. Drury Scenic Parkway: Bike and Hike DayNext: Oct 3, Nov 7 and Dec 5, 2026.Closed to cars the first Saturday of each monthOctober to May
Bald Hills RoadRoad damage. RVs and trailers not recommended.Open (road damage hazard)Open (road damage hazard)
Davison Road (Gold Bluffs Beach and Fern Canyon access)8 miles of gravel, two stream crossings.OpenOpen
Fern Canyon and Gold Bluffs Beach: vehicle reservation windowDavison Road to Gold Bluffs Beach and Fern Canyon.May 15, 2026September 15, 2026
Not live status · verified September 10, 2026

This is the schedule and the park's latest road table, not today's status. The park's current conditions page and its alerts are the places to check before you go. For Highway 101 and other state highways, NPS points to Caltrans, and Caltrans QuickMap has up-to-date highway information; in 2026, Caltrans construction on Highway 101 has closed the Damnation Creek trailhead until further notice, and an NPS alert warns of multiple traffic stops for road construction on Highway 101 between Orick and Crescent City, so allow extra time. Don't lean on online maps alone. NPS warns that many digital maps and GPS services misdirect visitors, sometimes along Bald Hills Road via isolated towns like Weitchpec. For the park's table, see the official Redwood road page.

Open roads, and what can close them.

Howland Hill Road, in the north of the parks, is listed as a year-round drive. It's 10 miles long and mostly narrow. From Crescent City it turns unpaved after about a mile and a half, as it enters Jedediah Smith Redwoods State Park, and stays unpaved for about five and a half miles. In spring, crews often repair it after winter storms, and parts may close for short periods.

The Newton B. Drury Scenic Parkway runs ten paved miles through Prairie Creek Redwoods State Park, past thousands of acres of old-growth redwood forest, and any vehicle of any size can drive it. Allow at least 20 minutes without stops, and reach it from Highway 101 at exit 765 or exit 753. Bald Hills Road, easiest to reach from Highway 101 about a mile north of Orick, is open but has road damage, so drive slowly and watch for cars crossing lanes to avoid it. Visitors to Lady Bird Johnson Grove drive its first three miles, and NPS calls the Lyons Ranch Trailhead, 17 miles east of Highway 101, a good place to turn around.

Two smaller roads work differently. NPS's scenic drives page says Cal-Barrel Road, a short unpaved road off the parkway, is closed to vehicles during the winter season, though the conditions table listed it open in September. On Coastal Drive, the former route south of Alder Camp toward Carruthers Cove is closed to motor vehicles. The Coastal Drive Loop north of Alder Camp is open and mostly paved, with a one-way northbound section between High Bluff Overlook and Klamath Beach Road.

Fern Canyon: the reservation season.

From May 15 through September 15, each vehicle driving to the Gold Bluffs Beach Area for day use, to park at the Gold Bluffs Beach picnic area or Fern Canyon, needs a reservation. Reservations are only issued online, and there are no same-day reservations, only in-advance or day-before ones. Campers with a current Gold Bluffs Beach or Elk Prairie Campground reservation don't need one. Walking in isn't restricted: the James Irvine Trail from the Prairie Creek Visitor Center reaches Fern Canyon in about 10.4 miles round trip. For now the conditions page lists that trail as partly open: the easternmost stairs between it and Fern Canyon are closed for construction, and the western stairs still reach the Fern Canyon Loop. The NPS Fern Canyon reservations page has the booking details.

Go by that reservations page on dates. It, the Gold Bluffs Beach page, and the conditions table all give May 15 to September 15. The Fern Canyon trail page's details box and NPS's scenic drives page still say May 1 to September 30, and the reservations page is the one that runs the booking system. Davison Road itself is 8 miles of single-lane gravel off Highway 101, with two stream crossings that can get your feet wet pretty much year-round, and NPS recommends high clearance vehicles, especially after rain storms.

Bike and Hike Days and winter storms.

From October to May, the park closes the Newton B. Drury Scenic Parkway to motorized vehicles on the first Saturday of each month for Bike and Hike Day, and hikers, leashed pets, strollers, and people on all sorts of wheels take over the road. Applied to the calendar, that's October 3, November 7, and December 5, 2026, then January 2, February 6, March 6, April 3, and May 1, 2027. Plan a drive on the parkway for another day.

Winter also closes the parkway without a schedule. NPS says it is often closed for days at a time because of fallen redwood trees or ice on the road, and park alerts carry the current conditions. Our Redwood in winter page covers the rest of a winter trip.

How crowds follow the reservation season.

Redwood's crowd follows the Fern Canyon reservation season. April averages 43% of the visits of June, the busiest month. May, when reservations start on the 15th, is 68%, and June is the peak.

Redwood visits by month around the road openings April: 40,599 visits, 43% of the peak month; May: 64,976 visits, 68% of the peak month; June: 95,116 visits, 100% of the peak month; September: 71,819 visits, 76% of the peak month; October: 49,415 visits, 52% of the peak month; November: 28,514 visits, 30% of the peak month April43% · 40,599 May68% · 64,976 June100% · 95,116 September76% · 71,819 October52% · 49,415 November30% · 28,514
Five-year mean recreation visits (2021 to 2025), NPS Visitor Use Statistics; percentages are the share of the park's busiest month.

September, when reservations end on the 15th, still averages 76% of June. October, the first month with Bike and Hike Days, is 52%, and November 30%. So a late September or October trip gets Fern Canyon without a reservation and with smaller crowds, as long as you plan around the first Saturday. The best time to visit Redwood page weighs the months, and the October guide covers the first full month without Fern Canyon reservations.

RVs, trailers, and narrow roads.

Five roads are poor choices for big vehicles. Recreational vehicles, trucks, and vehicles with trailers are too wide for Howland Hill Road. Bald Hills Road isn't recommended for RVs or trailers: it's windy, narrow, and rough, partly gravel and very dusty in summer, and logging trucks use it. On Davison Road, the Gold Bluffs Beach page says recreational vehicles and vehicles towing a trailer aren't permitted, while the reservations page says RVs over 24 feet and trailers aren't permitted. The conditions table says Cal-Barrel Road isn't recommended for trailers and large vehicles, and the scenic drives page says motorhomes, RVs, and trailers are prohibited there. On Coastal Drive, the section beyond High Bluff Overlook isn't suitable for RVs or vehicles towing trailers.

The parkway is the easy one: any vehicle of any size can drive it. Our Redwood camping page lists campground RV limits.

Common questions.

Are the redwoods open right now?

The roads are. Redwood has no entrance stations, and the park's conditions table lists its main roads as open, with any road it doesn't list also open. Two rules apply on set dates: a vehicle reservation for Fern Canyon from May 15 to September 15, and the parkway's Bike and Hike Day closures on the first Saturday of each month from October to May. Check the NPS current conditions page for storm closures before you drive.

Can you still drive through the redwood forest?

Yes. The Newton B. Drury Scenic Parkway takes any vehicle of any size ten miles through old-growth redwood forest in Prairie Creek Redwoods State Park, except on Bike and Hike Days and when winter storms close it. Howland Hill Road, a 10-mile road east of Crescent City, is another drive among the redwoods, but it's mostly unpaved and too narrow for RVs, trucks, and trailers.

Is Redwood National Park open all year?

Its main roads have no closing season on the park's table, and there are no entrance stations, though NPS's scenic drives page closes the short Cal-Barrel Road to vehicles in winter. What changes through the year is access: Fern Canyon needs a vehicle reservation from May 15 to September 15, the parkway closes to cars on the first Saturday of each month from October to May, and winter storms can close the parkway for days.

Is Redwood National Park open during a government shutdown?

Its roads generally stay open. The current National Park Service contingency plan says park roads, lookouts, trails, and open-air memorials will generally remain accessible to visitors during a lapse in appropriations. It also says parks will not provide regular road or trail condition updates, and that an area must be closed if access becomes a safety issue, such as weather or road conditions. The conditions table and alerts may not keep up, which matters most in winter storms.

Check before you travel

Dates, fees, and rules change. Confirm the current details on the official pages before you leave. NPS Redwood current conditions · NPS Gold Bluffs Beach and Fern Canyon reservations · NPS Newton B. Drury Scenic Parkway · Caltrans QuickMap

Facts on this page last verified September 10, 2026.

Where these facts come from

Road status, the Bald Hills hazard, Davison Road stream crossings, Cal-Barrel Road's listing, Mill Creek, the Damnation Creek closure, the James Irvine Trail status, and the Caltrans pointers come from the NPS current conditions page (updated September 10, 2026); Cal-Barrel Road's winter closure, Coastal Drive, and the May 1 to September 30 window from the NPS scenic drives page and the NPS Fern Canyon trail page; the Highway 101 construction stops from an NPS park alert; the reservation window, who needs one, booking rules, the hike-in alternative, and Davison Road's length and vehicle rule from the NPS Fern Canyon reservations page (updated August 21, 2026); the other Davison Road vehicle rule from the NPS Gold Bluffs Beach page. The parkway's length, vehicles, exits, Bike and Hike Day, and winter closures come from the NPS Newton B. Drury Scenic Parkway page; Howland Hill Road from the NPS Howland Hill Road page; Bald Hills Road from the NPS Bald Hills Road page; the 50-mile corridor and entrance stations from the NPS directions page. The Bike and Hike Day dates apply the park's first-Saturday rule to the calendar. The shutdown answer comes from the September 2025 National Park Service contingency plan posted on the Department of the Interior shutdown page. The road lines on the map are OpenStreetMap geometry between the end nodes of each named road, routed by OSRM (© OpenStreetMap contributors, ODbL); they show where each road runs, not its gates. Crowd numbers are five-year monthly means (2021 to 2025) of recreation visits from the NPS Visitor Use Statistics Data Package on NPS IRMA Stats. Independent site, not affiliated with the National Park Service.

Independence

Independent site. Not affiliated with or endorsed by the National Park Service. Data comes from the official NPS Visitor Use Statistics Data Package, 2025; editorial analysis is ours. The NPS Arrowhead and other NPS marks are not used.

Last updated · 2026-09-10