Road closures · Grand Teton

Grand Teton road closures and construction.

By Nicholas Major · Last updated

Grand Teton road closures follow a winter schedule and, in 2026, a heavy construction year. The Teton Park Road and the Moose-Wilson Road close to cars on November 1, the main highway stays open all winter, and Death Canyon Road is closed to all use for a rebuild that runs to June 2027. This is the schedule, not live status. For today, check the NPS Road Status Map or WYDOT at 1-888-WYO-ROAD.

Grand Teton roads by 2026 opening date US 89/191 and US 26/287: open all year. Teton Park Road: May 1, 2026 to November 1, 2026. Moose-Wilson Road (winter): Mid-May to November 1. Moose-Wilson Road near Moose (2026 work): June 20, 2026 to September 8, 2026. Death Canyon Road and Trailhead: closed. Grassy Lake Road: When snow melts to When snow returns. Antelope Flats and other dirt roads: When snow melts to When snow returns Moose-Wilson Road: Moose Entrance to Granite Canyon Entrance: Mid-May to November 1 Teton Park Road: Taggart Lake Trailhead to Signal Mountain Lodge: May 1, 2026 to November 1, 2026 Death Canyon Road: Laurance S. Rockefeller Preserve to Death Canyon Trailhead: closed Highway US-89/191/26/287 (Outer Park Road): Moran Entrance to Flagg Ranch: open all year Flagg Ranch Moran Entrance Taggart Lake Trailhead Moose Entrance Death Canyon Trailhead Granite Canyon Entrance Open to cars all yearOpens May 1, closes Nov 1Mid-May to November 1, no fixed dateClosed to all use (rebuild to June 2027) Park boundary: NPS · state outlines: U.S. Census · roads: © OpenStreetMap contributors via OSRM · points as credited below
Teal is the main highway, plowed and open all winter. The Teton Park Road is coloured for its May 1 to November 1 season, the dashed Moose-Wilson Road closes November 1 and reopens around mid-May, and the rust line is Death Canyon Road, closed to all use. The 2026 construction closure near Moose, Grassy Lake Road, and the dirt roads are not drawn. Road lines are OpenStreetMap geometry routed by OSRM (© OpenStreetMap contributors, ODbL); dates are from the NPS roads and road construction pages.

In short

Grand Teton National Park is open all year, and its main highway, US 89/191 and US 26/287, is plowed and open in winter from Jackson to Flagg Ranch. The Teton Park Road is closed to cars from November 1 to April 30 between Taggart Lake Trailhead and Signal Mountain Lodge, so it opens May 1. In winter it is groomed for skiing, snowshoeing, and hiking from mid-December to mid-March. The Moose-Wilson Road closes November 1 until mid-May, depending on conditions. In 2026 it has a second closure: construction shuts the stretch between the Laurance S. Rockefeller Preserve and Moose from September 8 to November 15. Death Canyon Road and Trailhead are closed to all use for a rebuild that runs May 2026 to June 2027. Grassy Lake Road and dirt roads such as Antelope Flats close based on conditions. This page is the schedule, not live status. Check the NPS Road Status Map before you drive.

Use this pageShare or cite this guide

National Sites Guide

Share this page

Cite this page

Copy a citation

Every Grand Teton road on one timeline.

Two Grand Teton roads close on a schedule, the Teton Park Road and the Moose-Wilson Road, both on November 1. Other roads close based on conditions. NPS says roads close in winter for recreational use and to give wildlife corridors. In 2026, construction adds closures on top of that schedule, and the park updated its road construction page on September 8, 2026.

Grand Teton road seasons, 2026 US 89/191 and US 26/287: open all year; Teton Park Road: 2026-05-01 to 2026-11-01; Moose-Wilson Road (winter): Mid-May to November 1 (no fixed date); Moose-Wilson Road near Moose (2026 work): 2026-06-20 to 2026-09-08; Death Canyon Road and Trailhead: closed: Closed to all use from May 2026; Grassy Lake Road: When snow melts to when snow returns (no fixed date); Antelope Flats and other dirt roads: When snow melts to when snow returns (no fixed date) JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC US 89/191 and US 26/287Plowed and open all winter, Jackson to Flagg Ranch. Teton Park RoadTaggart Lake Trailhead to Signal Mountain Lodge.May 1Nov 1 Moose-Wilson Road (winter)Reopens mid-May, based on conditions. Moose-Wilson Road near Moose (2026 work)Closed May 1 to June 19 and Sept 8 to Nov 15, 2026.Jun 20Sep 8 Death Canyon Road and TrailheadRebuild runs May 2026 to June 2027.CLOSED Grassy Lake RoadWest of Flagg Ranch. Oversnow use in winter. Antelope Flats and other dirt roadsAlso Deadmans Bar, Pilgrim Creek, Schwabacher, Two Ocean.
Each bar is when a road is open to cars in 2026. The Teton Park Road dates are the park's own. The Moose-Wilson Road closes November 1, but its mid-May reopening is approximate. The Grassy Lake Road and dirt-road bars are our estimate (May through October, from NOAA snowfall normals), because NPS closes those roads based on conditions. The Moose-Wilson construction bar is the summer stretch when that section was open with delays. Death Canyon Road is closed all year.
Road segment2026 opening2026 closing
Highway US-89/191/26/287 (Outer Park Road, Moran Entrance to Flagg Ranch)Plowed and open all winter, Jackson to Flagg Ranch.Open year-roundOpen year-round
Teton Park Road (Taggart Lake Trailhead to Signal Mountain Lodge)Taggart Lake Trailhead to Signal Mountain Lodge.May 1, 2026November 1, 2026
Moose-Wilson Road (Moose Entrance to Granite Canyon Entrance)Reopens mid-May, based on conditions.Mid-MayNovember 1
Moose-Wilson Road, Laurance S. Rockefeller Preserve to Moose (2026 Phase II construction)Closed May 1 to June 19 and Sept 8 to Nov 15, 2026.June 20, 2026September 8, 2026
Death Canyon Road and Trailhead (Laurance S. Rockefeller Preserve to Death Canyon Trailhead)Rebuild runs May 2026 to June 2027.Closed to all use from May 2026Project timeframe ends June 2027
Grassy Lake Road (Flagg Ranch west, Rockefeller Parkway)West of Flagg Ranch. Oversnow use in winter.When snow meltsWhen snow returns
Secondary dirt roads (Antelope Flats, Deadmans Bar, Pilgrim Creek, Schwabacher, Two Ocean)Also Deadmans Bar, Pilgrim Creek, Schwabacher, Two Ocean.When snow meltsWhen snow returns
Not live status · verified September 10, 2026

This is the season and construction schedule, checked September 11, 2026, not today's road status. The park's Road Status Map shows park roads and construction, but NPS says updates may be delayed and short-term closures and delays may not show. For real-time road status, NPS points to WYDOT: call 1-888-WYO-ROAD, dial 511 from a cell phone, or use wyoroad.info. Park visitor information is 307-739-3399, Monday to Friday during business hours. For today's status, check the official Grand Teton road page.

The main highway, open all winter.

The park's main roadways, US 89/191 and US 26/287, are plowed and open for winter travel from the town of Jackson to Flagg Ranch, just south of Yellowstone. That is the road past the Moran Entrance all year. NPS warns that park roads are often snow-covered and icy in winter, so use winter or all-season tires, carry tire chains for mountain passes, and keep a winter safety kit in the car.

Driving on into Yellowstone in winter is a different trip. Yellowstone's roads are closed to motorized vehicles in winter except the road from Mammoth Hot Springs to Cooke City, so from this side Flagg Ranch is as far north as the plowed highway goes. Our Yellowstone road closures page has those dates, and Yellowstone's road line is 307-344-2117.

2026 construction closures and delays.

Death Canyon Road and Trailhead are closed to all use, pedestrians included, for a project that runs May 2026 to June 2027. The road will be paved, shortened by one mile, and end at a new trailhead, so hikes into Death Canyon will be longer afterward. Until then, reach Phelps Lake and Death Canyon from the Granite Canyon Trailhead or Jackson Hole Mountain Resort. Parking at the Laurance S. Rockefeller Preserve is limited, and NPS expects long waits.

The Moose-Wilson Road has two separate closures in two different places. Its winter closure runs November 1 to mid-May, and in winter the road is unplowed from Death Canyon Road to Granite Canyon Trailhead. Its 2026 construction closure is at the north end, between the Laurance S. Rockefeller Preserve and Moose: closed May 1 to June 19, open with delays of 45 minutes or longer from June 20 to September 7, and closed again from September 8 to November 15.

Elsewhere, expect delays. A new roundabout on the Teton Park Road just north of the Moose Entrance Station adds delays of 20 minutes, not counting the entrance station wait, from May 1 to November 15. Menor's Ferry Road, the way to the Menor's Ferry Historic District and the Chapel of the Transfiguration, is closed to all use on weekdays. On the North Park Road between Leeks Marina and Lizard Creek Campground, about 7 miles north of Colter Bay, a temporary stop light runs one lane at a time, with delays of 15 minutes from 6 a.m. to 9 p.m. and up to one hour from 9 p.m. to 6 a.m. NPS says timelines can change and that turnouts, viewpoints, and parking areas near the work may be closed.

Winter: skis and snowshoes on the closed roads.

From November 1 to April 30 the Teton Park Road between Taggart Lake Trailhead and Signal Mountain Lodge is open to non-motorized use only. It is groomed for skiing, snowshoeing, and hiking from mid-December to mid-March. Before the snow, you can bike it from November 1 until it is snow covered, and again in spring once the snow melts, until April 30. Once it is snow covered, bikes, fat tire bikes, and roller blades are not allowed. Pets are allowed on the road after November 1, and once it is snow covered, leashed pets can use the multi-use lane.

The Moose-Wilson Road is open to skiing, snowshoeing, and hiking in winter too. NPS suggests parking at the Granite Canyon Trailhead to ski or snowshoe it. Grassy Lake Road, west of Flagg Ranch in the Rockefeller Parkway, is unplowed in winter, and once NPS decides there is enough snow it opens to oversnow use by snowmobiles, skiers, snowshoers, and hikers. Antelope Flats, Deadmans Bar, Pilgrim Creek, Schwabacher, and Two Ocean roads close seasonally based on conditions, with no set dates. Our Grand Teton in winter page covers the rest of a winter trip.

How crowds follow the Teton Park Road.

Grand Teton's spring crowd waits for the Teton Park Road. April, with that road closed to cars through April 30, averages 10% of the visits of July, the busiest month. May, when it opens on May 1, jumps to 42%, and June to 86%.

Grand Teton visits by month around the road openings April: 75,333 visits, 10% of the peak month; May: 305,741 visits, 42% of the peak month; June: 632,518 visits, 86% of the peak month; September: 564,320 visits, 77% of the peak month; October: 247,505 visits, 34% of the peak month; November: 50,017 visits, 7% of the peak month April10% · 75,333 May42% · 305,741 June86% · 632,518 September77% · 564,320 October34% · 247,505 November7% · 50,017
Five-year mean recreation visits (2021 to 2025), NPS Visitor Use Statistics; percentages are the share of the park's busiest month.

Fall runs the other way. September is still 77% of July, October 34%, and November, with the Teton Park Road closed from November 1, 7%. In 2026 the roundabout work near Moose runs to November 15, so a quiet October still comes with construction delays. The best time to visit Grand Teton page weighs the months, and the October guide covers the last full month the Teton Park Road is open to cars.

Common questions.

Does a government shutdown close Grand Teton's roads?

Generally, no. The current National Park Service contingency plan says park roads, lookouts, trails, and open-air memorials will generally remain accessible to visitors during a lapse in appropriations. It also says parks will not provide regular road or trail condition updates, and that an area must be closed if access becomes a safety issue, such as weather or road conditions. The winter schedule on this page does not change, but the Road Status Map may not be kept up, so lean on WYDOT at 1-888-WYO-ROAD.

Check before you travel

Dates, fees, and rules change. Confirm the current details on the official pages before you leave. NPS Grand Teton park roads and Road Status Map · NPS road construction · WYDOT road information

Facts on this page last verified September 10, 2026.

Where these facts come from

Winter closures, grooming, biking and pet rules, the conditions-based roads, the main highway, the Road Status Map, WYDOT, winter driving advice, and the Yellowstone note come from the NPS Grand Teton park roads page; the 2026 closures, delays, and project details from the NPS road construction page (updated September 8, 2026); the non-motorized rule and Granite Canyon parking tip from the NPS winter page. The shutdown answer comes from the September 2025 National Park Service contingency plan posted on the Department of the Interior shutdown page. The Grassy Lake Road and dirt-road timeline bars are our estimate from NOAA NCEI 1991-2020 snowfall normals for the Moran 5WNW station (USC00486440), not park dates. The road lines on the map are OpenStreetMap geometry between OSM nodes, routed by OSRM (© OpenStreetMap contributors, ODbL); they show where each road runs, not its closure gates. Crowd numbers are five-year monthly means (2021 to 2025) of recreation visits from the NPS Visitor Use Statistics Data Package on NPS IRMA Stats. Independent site, not affiliated with the National Park Service.

Independence

Independent site. Not affiliated with or endorsed by the National Park Service. Data comes from the official NPS Visitor Use Statistics Data Package, 2025; editorial analysis is ours. The NPS Arrowhead and other NPS marks are not used.

Last updated · 2026-09-10